Skip to content
Zoevin

ZV / Automation

Which job eats the week?

The same thing gets typed twice, and paperwork gets chased by hand. The month takes days to close. Pick the loop you want gone.

None of those? About 3 minutes to run the numbers.

Run the numbers

Automation for engineering and architecture

PDF bills matched to a phase by hand

Invoices wait until a PM checks them against the phase budget.

Number to bringHow many hours a week does a PM spend matching sub-consultant bills to a phase?

Run the numbers on this one

The phase overran before anyone drafted the extra work

Scope creeps on a fixed fee, and the write-off shows up at the monthly review.

Number to bringRoughly how much unbilled extra work do you write off in a year?

Run the numbers on this one

Bring those two numbers

About three minutes. You type the numbers; I do not invent them. The first conversation is next if the loop is worth mapping.

Run the numbers

Next step

Tell me which one it is

The first conversation is free, and it’s genuinely fine to arrive without knowing what you need.